Bellara Steel Complex Balance of Plant

Employer

Algerian Qatari Steel

Consultant

Idom, Spain

Role of BUTEC

Main contractor in JV with Elecnor

Commencement Date

April 2015

Completion Date

October 2018

Scope of Work

Construction of all utilities buildings, foundation works for technological packages, piping and cabling interconnection between technological packages, roads, and infrastructure surrounding the different process facilities of the steel factory

Project Description

  • Foundation works for the technological packages in the BELLARA project such as piling works (872 piles) and concrete foundations (45,000 m3)
  • Construction of concrete utility buildings (offices, locker rooms, etc.) (Built-up area of 7,500 m2)
  • Construction of steel structure buildings (warehouses, workshops, etc.) (3,500 tons or built-up area of 82,000 m2)
  • Construction of pipe rack between the technological packages (1,500 tons)
  • Supply and installation of the pipe network between the technological packages (10,000 m)
  •  Supply and installation of electrical and instrumentation network between the technological packages

    (150,000 m2)

  • External works such as road works, fence and main entrance area. (85,000 m2 of roads and 1,000 m of fence)
  • Supply and installation of railways inside the boundary of the project (7,000 m)
  •  Construction of a slag area and water basins for the project (74,000 m2)