Barwa Wastewater Treatment Plant

Employer

Barwa City – Marafeq Qatar

Role of BUTEC

Main contractor in Consortium with Degrémont, subsidiary of “Groupe Suez”, France

Commencement Date

April 2010

Completion Date

December 2012

Scope of Work

EPC for civil works, electro-mechanical installation as well as erection of all equipment.

Project Description

  • Population equivalent: 50,000 PE
  • Total daily design flow: 13,500 m3/d
  • Design peak flow: 1,400 m3/h
  • EPC of 18 process structures (pretreatment cyclor cells, filtration, dewatering building, etc.)
  • Construction of ancillary buildings (administration, workshops, laboratory, pump house,etc.)
  • Landscaping and related networks
  • Installation of process utility networks (sludge, industrial water, rain water drainage, etc.)