CAPABILITIES
ACTIVITIES
-
Distribution Network with Customer and Metering Services
Scope of Work Network survey Assessing the condition of all assets Developing network mapping Network inventory Plans & programs Developing procedures for each of the activities to be performed in the execution of the contact Developing an investment plan to improve the state of the network based on the survey findings Planning & design Revision…
-
Tripoli South Stadium
Scope of Work EPC for an Olympic sports stadium (football and other athletic sports) constructed for the Asian Football Cup in a restricted timeframe Project Description Concrete volume: 24,450 m3 Total number of seats: 22,300, with VIP and presidential cubicles Total green area : 12,800 m2 Facilities, lounges and reception areas, media podiums and amphitheater,…
-
Beirut Central District Hilton Hotel
Scope of Work Construction of a five-star hotel in downtown Beirut, with special attention to architectural and interior design details, which create a high quality designer hotel. Project Description Overall built area 23,000 m2, 17,000 m2 of superstructure and 6,000 m2 underground 5 basement levels, ground & mezzanine levels, 7 current floors,and a roof floor…
-
Port of Beirut Second Line Defense
Scope of Work The scope of work includes conceptual design, procurement and installation of the radiation portal monitors (RPM), including related works such as earthworks, pavement, foundations, electrical work, collision protection, structural support for the enclosures, security, traffic controls and modifications to the existing electrical infrastructure. The scope of work also includes power and communication…
-
Gas Turbine Units
Scope of Work Installation and erection of the GT units including power trailer, control trailer, gas skids and small accessory components Supply, prefabrication and installation of gas piping including all necessary supports, NDT test, painting and insulation Supply, prefabrication and installation of steel structure including all necessary supports, painting and insulation Installation and connection of…
-
Bellara Steel Complex Balance of Plant
Scope of Work Construction of all utilities buildings, foundation works for technological packages, piping and cabling interconnection between technological packages, roads, and infrastructure surrounding the different process facilities of the steel factory Project Description Foundation works for the technological packages in the BELLARA project such as piling works (872 piles) and concrete foundations (45,000 m3)…
-
Banias Refinery Fuel Storage Tanks & Related Pipeworks
Scope of Work EPC contract for the construction of 10 storage steel tanks, 33,000 m3 each 8 tanks with floating roof for heavy crude oil, light crude oil, naphta and gasoil 2 tanks with fixed roof for fuel oil Project Description Steel plates conformant to ASTM and API specifications Distribution pipe network – according to…
-
Treated Water Sea Outfalls for Wastewater Treatment Plants
Scope of Work EPC on turnkey basis including testing, commissioning and maintenance for 4 sea outfalls to discharge treated water offshore into the sea. Although the UV tertiary treatment ensures the elimination of pathogenic agents, a model simulating the discharge dilution using CORMIX-GI was developed in order to protect the frontal coast from any risk…